Skip to content

Posts from the ‘Staircase with flexible geometry’ Category

19
May

Staircase with flexible geometry

* Total vertical drop of up to 1000 mm: 1st Level, 2nd Level. No toilet, access ramp 4 cm.Dimension useful shelf adapted to the configuration and width achieved in 5 / 6 steps of a H of 166 mm.

* Finishes and Equipment Shelf:

- The floor is made of wood or metal structure, alternative or soil is made by the customer

- The machine is placed between the pillars with handrail, or find the commands up down the platform.

- Containing the buttons is performed by a steel box painted on top of a medium serving as cache power cables.

- Equipment of this band has a button to push to get constant and 1 for the climb. A switch from STOP reset safety.

- Prints needed.

- The structure will consist of two vertical pillars painted steel.

- The top flap is not expected because the automatic return position stair is planned.

Optionally, the arms may be provided as the low side as the high side.

- On the landing above, a call button that raises the machine by upgrading the top of all the steps. Conversely for the low tier. A call button at the bottom and the top is provided for each level of appeal to the desired floor, location to be determined in respect of areas of rotation for PMR.

- Embarked on the machine to the low side, an edge-sensitive switch under the machine to avoid the crash. A small ramp for easy access to the machine to compensate for the height of the structure, it also serves as protection against falling from a wheelchair, he is in raised position during travel of the machine.

* Electrical installation of all the machine is provided by us according to our standard.

* Operating in: calling machine is the priority button is pressed, it goes up or down a specified delay puts the machine in position of stairs after a detection of absence on the machine. The call button on the top or bottom step activates the ascent or descent of the machine to reach the level of expectation.

* Controls: Permanent-action “this man”. Control panel for raising and lowering + stop + alarme.Tableau emergency call to the floor and above board.

* Standards: The equipment complies with the guidelines and standards: – Machinery Directive 2006/42 / EC.

* Safety features: contact bar under the machine edges between the spaces between the treads to avoid crushing / pinching when setting up the stairs in the studio.

* Load admitted: Static load of 200 Kg recorded on a metal structure.

Print This Post Print This Post